top of page
Highland Creek Erosion Control
Toronto
Greck was retained by the Toronto and Region Conservation Authority to oversee and provide water resource and civil engineering services including erosion control analyses, detailed design drawings, construction specifications and site construction inspections to replace an existing failed channel bank along a portion of Highland Creek.
An armourstone wall and boulder revetment were designed and constructed with the assistance of geotechnical investigations and structural engineering services to provide long term stabilization of the valley and channel slope.
bottom of page